England 2 – España 2

I’ve levelled the score and now we’re drawing on aggregate.

The carpenter arrived fifteen minutes ahead of schedule on Monday and installed the internal doors. 2-1.

I’m sitting on the balcony with a cup of coffee made in my newly installed kitchen. After three sweltering days, the sun is just peeping through the clouds and the birds are singing in celebration. The equaliser!

All is well with the World.

The kitchen took three and a bit days for Spain’s slowest kitchen fitter to assemble, but it looks great, and I have the satisfaction of knowing that he checked and double-checked every screw and bolt.

20130606-122735.jpg

Now all that remains is painting, furniture, and a bit of landscaping and the barn will be finished, allowing thoughts to turn to the big house.

More on the kitchen and other exploits when I have better wifi access.

This entry was posted in Barn Renovation, The House in Liñeiras and tagged , , . Bookmark the permalink.

2 Responses to England 2 – España 2

  1. Cole says:

    A fine looking kitchen! I love the floor. So will you be staying in the barn then?

    • admin says:

      Cole – very happy with it and I am sure that Amanda will be too when she sees it for the first time in the flesh (or I’m for the high jump). Once we have our ‘Obras Final’ then we’ll definitely be stopping there. Sooner rather than later I hope.

Leave a Reply

Your email address will not be published.